Skip to Content

Evergreen//One Roles & Responsibilities

No

Description

Pure

End User

DESIGN AND ENGINEERING

1

Engineering and certification integration standards for Pure deployments

2

Physical and logical solution design

3

Security procedures and requirements for Pure deployments

INSTALLATION*

4

Overall Site planning, including prerequisites for the physical install of the storage array(s)

5

Configuration of storage array(s)

6

Preparation of networking environment for connectivity and replication between array(s)

7

Design and configuration of environment required for monitoring of the storage array(s)

8

Provision of service infrastructure and cabling between array(s) and switches

9

Installation of Pure Storage equipment, including: racking, stacking, internal cabling, power-on, and health checks

10

End-to-end solution testing and acceptance

MANAGING STORAGE SERVICES

11

Volume, host connections, network, and rack provisioning, BAU operations

12

Software licences within the service infrastructure and software stack for basic and advanced features of OS

13

Evergreen non-disruptive service infrastructure upgrades throughout Service Term

14

Uptime guarantee for capacity upgrades, refresh and other planned outages

15

Service infrastructure support, including: notification of identified events, hardware replacement, software upgrades, and capacity utilization

16

15 minute Sev 1 response time SLA, 4 hours on-site break-fix response time SLA, case reporting and handling

17

Asset and capacity management, shipping logistics and lifecycle management, including: non-disruptive capacity upgrades, required service infrastructure refresh

18

Remote monitoring, reporting, predictive analytics, and automated support services

19

Install services to support capacity expansions/reductions and required upgrades

20

Ownership of overall change control process for all customer infrastructure including coordinating approvals

21

Equipment decommissioning and secure erase at the time of termination

22

Equipment pick up and returns, or swap, at the time of termination

REPORTING, TRAINING, AND SUPPORT

23

Monthly consumption reporting and regular service performance reviews across locations, recurring billing and supporting details to facilitate internal chargeback

24

Admin guides, operational manuals, best practice white papers, etc.

Slide

* Initial Installation Services are performed upon service activation only; some support services may be provided by an Authorized Support Provider, if opted-in at time of purchase.

 

Last Updated August 16, 2024

Uw browser wordt niet langer ondersteund!

Oudere browsers vormen vaak een veiligheidsrisico. Om de best mogelijke ervaring te bieden bij het gebruik van onze site, dient u te updaten naar een van deze nieuwste browsers.