When this online dating pioneer needed to radically reduce storage operational costs and prepare for 2-3X application scale via platform consolidation, Match Group’s E&E brands chose Pure Storage.

Actions
5 min. read
Challenges
Match Group’s E&E division embarked on a private cloud re-architecture project for data growth and cost optimization. The company needed the ability to scale infrastructure by two to three times to make room for more workloads, plus machine learning and AI, while reducing costs. It needed to cut power and cooling in half and better support snapshots, because performance impacts from snapshots on the previous storage platform stood in the way of full ransomware recovery.
Results
With FlashArray™, Match Group’s E&E division can achieve three times scale, along with lower TCO, faster throughput, and greater data reduction versus its previous solution. Pure Storage reduces power consumption by 65% and storage footprint from 332U to 18U. Performance is not impacted at all by running snapshots, and Evergreen//Forever™ removes the need for data migration tools. The ability to upgrade non-disruptively was one of the compelling reasons for looking at Pure in the first place.
TCO Savings
50%
on acquisition and maintenance cost
Data Reduction
2:1
for greater storage efficiency
Smaller
94%
storage footprint
Lower
65%
power consumption
Table of Contents

Introduction

The largest online dating company in the world, Match Group sparks meaningful connections between people in more than 190 countries with well-known brands like Match.com, Tinder, Hinge, Plenty of Fish, OkCupid and others that are available in more than 40 languages. The efficiency Match Group achieves in array reduction, data reduction, and access speed with Pure Storage gives the company room for sizable growth at optimal cost.

“Pure Storage gives us best-of-breed software, best-of-breed hardware, and best of support for a better solution at a lower cost. That makes a lot of sense from a TCO standpoint.”

Bryan White

Director, Platform Engineering Infrastructure Services, Match Group E&E Brands

Unlocking TCO Savings On-prem and in the Cloud

IT teams are under incredible pressure to reduce costs while providing seamless data access.
Unlocking TCO Savings On-prem and in the Cloud
IT teams are under incredible pressure to reduce costs while providing seamless data access.
Actions
5 min. read
“Pure Storage is more efficient than our previous solution. We are able to scale without having to buy more iron for our data center.”

Bryan White

Director, Platform Engineering Infrastructure Services, Match Group E&E Brands
More Stories Like This
Hôpital Montfort verhelpt zijn opslagproblemen
“Pure Storage stelt ons in staat om veel sneller te reageren op onze operationele teams omdat de capaciteitsvraag niet meer aan de orde is.”
Richard DeVore foto
Richard DeVore
Hoofdarchitect
Richard DeVore foto
Richard DeVore
Hoofdarchitect
City of Bloomington moderniseert voor het datatijdperk
Uw browser wordt niet langer ondersteund!

Oudere browsers vormen vaak een veiligheidsrisico. Om de best mogelijke ervaring te bieden bij het gebruik van onze site, dient u te updaten naar een van deze nieuwste browsers.